Completed Projects

Color: Light Stone

Engineered in-house and built by our own team, this project reflects the same care and attention to detail we bring to every building.

Drifton Precision | CB007

Drifton Precision | CB007 A crane changes what a building has to carry, and a tie-in changes what it has to meet. Drifton Precision CB007 is a 46×80 steel building in Pennsylvania with a 3-ton top-running overhead crane, tied into an existing Pioneer pole building. It is a steel[…]

Holly Shores Campground | CB004

Holly Shores Campground | CB004 A second floor changes every decision on the first. Holly Shores Campground CB004 is a 36×73 campground office in New Jersey with a gift shop, reception, three offices, a laundry room, and two bathrooms under a 2,780 square foot second floor. The stair opens[…]