Completed Project

Pottsville Fire Company | MF005

Engineered in-house and built by our own team, this project reflects the same care and attention to detail we bring to every building.

Pottsville Fire Company | MF005

A station addition has to meet the old building at every joint. Pottsville Fire Company MF005 is a 55×58 fire station addition in Pennsylvania with three 14×14 insulated doors facing the street. A 26x9x32 stair tower rises beside them.

This post-frame fire station ties into the existing roof, slab, drains, and curb. Read how those joints were handled before you scope your own.

Photos of a 55×58 Fire Station

Look first at the brown gable end, where three white overhead doors with window rows stand under a sign for Pottsville Fire Co #1. Yellow bollards guard the doors. At the right, a taller red tower has white windows and a door above a band of brick. A wide concrete apron spreads across the front of the doors, under a clear blue sky.

Planning a barndominium, a commercial building, or a facility that has to work as hard as you do? Browse real completed Pioneer Buildings projects in our Project Gallery and compare the finishes, layouts, and details that fit your property.

Post-Frame Fire Station Specifications

On this post-frame fire station, the roof framing does the hard work. All trusses over the new and existing apparatus bays are upgraded to 6/12 attic trusses, with two girder trusses on either side of the staircase hallway. Two staggered layers of 5/8-inch fire-rated gypsum hang from the bottom chord.

Project Details
Building Colors
Construction Features
Openings & Access
Overhang Details
Additional Features

Why Choose Pioneer?

A fire station must be ready when the call comes. Here is how Pioneer Buildings, a Pennsylvania fire station builder, set this one up:

Want to personalize your build? We offer a variety of siding styles, including metal in 18 colors, vinyl, stone veneer, and board-and-batten. Roofing options include metal and shingles. With upgraded hardware, customizable interior layouts, and a wide selection of accessories, you can create a building that matches your style, needs, and goals.

Frequently Asked Questions

How do you add onto an existing fire station?

Plan the joints first, where new work meets old. Here, an 18-foot extension needed selective demolition and roof integration, and the three new trench drains tie into the existing drain.

Can a post-frame building have a stair tower?

Yes, tied into the roof like any other wing. Here, a 26x9x32 stair tower meets the new roof at a right angle, with Perma-columns on 3-ply 2×6 posts and a pine box staircase.

What makes a post-frame station fire-rated?

Fire-rated gypsum, rated doors, and fire blocking, laid out in the plans. Here, two staggered layers of 5/8-inch gypsum hang under the attic trusses, and the stair tower has fire-rated steel doors.

Does brick veneer work on a metal-sided building?

It can, as a two-tone accent next to the metal. Here, Brownstone wire-cut brick veneer pairs with brown and red siding.

Pricing & Financing Options

On a fire station addition, the quote follows the tie-ins more than the footprint. The 32-foot stair tower, the 6/12 attic trusses over the new and existing bays, two layers of fire-rated gypsum, the brick veneer, three 14×14 insulated doors with openers, and the concrete package each move the number. Selective demolition, roof integration, and the trench drain and curb tie-ins add scope too. Pioneer does not publish a price because none of that is catalog work. Tell us what your station must connect to, and we will price your version.

Financing is available through Hearth. Learn more about our Financing Options, call (888) 448-2505, or Request Your Free Quote to get started.

Service Area

Pioneer Buildings proudly serves customers in Pennsylvania, New Jersey, New York, Delaware, Maryland, West Virginia, and Virginia. Pioneer has completed 30,000+ post-frame buildings since 1998.

Final Thoughts

Treat each bay floor as one system. The 14×14 doors, the 8-inch slab, the 18-foot trench drain, and the bollards sit in the same spec here, because each sets a height or a position the others must meet. The trade-off is coordination: the drain has to meet the existing line, and the slab has to meet the door thresholds. Settle those elevations together before the concrete is placed, and quote the doors, slab, and drains as one scope, so no crew is guessing at a height.

See more featured projects and behind-the-scenes content from Pioneer Buildings on Instagram, Facebook, and LinkedIn.

Pottsville Fire Company MF005, a Pennsylvania fire station addition with brown siding, a red tower, and three white doors
Quick Recap

Project Details

Location

Colors

    Send a Message

    How Can We Help?

    Takes about 1 minute.

    Fields marked * are required.


    By submitting this form, you consent to receive messages from Pioneer Buildings and our Family of Companies based on the boxes you checked above: transactional and project-related texts if you checked the first box, and promotional texts and emails if you checked the second. Message frequency varies, and msg & data rates may apply. Consent is not a condition of purchase; you may opt out at any time by replying STOP to texts or clicking Unsubscribe in any email. For more information, view our Privacy Policy and Terms of Service.

    Samples

    Completed Projects

    The Pioneer B004, a Pennsylvania barndominium with ash gray siding, a charcoal roof, and two black garage doors
    MF005 55x58x18 Post Frame Fire Station for Pottsville Fire Company in Pennsylvania
    Custom Garage CG004 New York Post-Frame Garage
    Evergreen Escape 52x40 post-frame barndominium in Pennsylvania
    Meshoppen Fire Department pole barn with red metal roof and tan siding built by Pioneer Building"
    The In-Law 30x32 residential barndominium in Pennsylvania